← All projects
FAO
Biogas and bio-fertilizer pilot in Teso
Piloting clean, labour-saving energy as a climate-smart technology in Katakwi and Kaberamaido.
Why it matters
Every one of the 20 host households cooked with firewood, burning about 50 kg a day each, with the cost to health, time and forests that brings.
Objectives
To pilot clean, safe and labour-saving energy as a climate-smart technology for gender-responsive transformation and climate mitigation, by fabricating and installing 20 biogas and bio-fertilizer systems.
What we did
- Held sensitisation workshops in both districts with district, sub-county and farmer group leaders
- Trained youth and women as artisans to fabricate, install and maintain Flexi-Biogas, each with a business canvas
- Installed one digester at each host household and trained it in feeding, maintenance and bio-slurry use
- Translated the operating and troubleshooting manual into local languages
- Measured the CO₂ offset and ran a cost-benefit analysis of replacing firewood with biogas
Results
- 20 Flexi-Biogas and bio-fertilizer units of 9 m³ fabricated and installed, ten in each district
- 42 youth and women trained as biogas artisans
- Over 250 smallholder farmers trained in biogas use and bio-fertilizer application
- A business model developed for youth and women to sell, install and service biogas systems
- About 777 tonnes of CO₂-equivalent avoided each year by replacing firewood, by the project’s own estimate
| Funder | FAO (contract CT-FAO UGA-2024-015) |
| Contract | UGX 168,058,000 |
| Duration | July to December 2024 |
Challenges and how we responded
- Prolonged drought cut the amount and quality of cow dung, so gas output varied
- Households often walk long distances for the water needed to mix feedstock
- Upkeep fell mostly on women; household sessions now stress that men and youth share it
- Installations are far apart, so we trained community focal points to give first-line support